Why Building is Broken and the Fixes Aren't What You Think
The construction industry is broken. For decades, it has been plagued by stagnant productivity, inefficiency, and a stubborn resistance to change. While most are chasing salvation in AI and robotics, they're looking in the wrong place. The revolution isn't technological—it's philosophical.
The most profound shifts transforming the built environment are not about layering new tools over old problems; they represent a complete paradigm shift in how we conceive, design, and deliver buildings. This isn't theory. Insights from global industry leaders, proven on massive government initiatives, have uncovered a blueprint that cracks the code the rest of the industry is struggling with. Here are six counter-intuitive truths that reveal the real future of construction.
1. It's Not About Better Projects, It's About Manufacturing Programs
The single most important shift in modern construction is moving from a project-centric mindset to a programmatic one. The industry's habit of tackling challenges one building at a time is the root cause of its inefficiency. Treating a single building as a one-off foray into off-site manufacturing often proves so difficult and costly that clients revert to traditional methods, convinced that the new approach doesn't work.
The key to unlocking true efficiency, quality, and cost savings is to shift from project-by-project thinking to focusing on the manufacturing processes that deliver each outcome. This approach creates the scale necessary for real innovation. As Dale Sinclair, Global Lead for MMC at WSP, states, this is a non-negotiable shift.
"What we're doing is we're shifting from constructing projects to manufacturing programs. For me, you need to do both things at the same time. You cannot tackle the challenges that we have in the globe one project at a time."
2. The Biggest Barrier Isn't Technology, It's a Two-Word Phrase: "Yeah, But..."
The primary obstacle to modernizing construction is not a lack of technology but a deeply ingrained cultural and behavioral resistance to change. This inertia often boils down to a familiar, dismissive phrase heard in project meetings: “Yeah, but…” It acts as a verbal roadblock, shutting down new ideas and methods before they can be properly considered.
This cultural barrier is why new tools often fail to gain traction. The path forward requires a radical change in behavior. This was proven on the UK’s New Prison Program, a massive government initiative to build four new "super prisons" concurrently. As detailed by Andrew Dutney of Kier Construction, the program’s success hinged on an "Alliance Model" contract that forced a cultural reboot. Competing contractors had to "leave their company badges at the door" and collaborate with a singular focus on the "best for program" outcome. This shift from a competitive to a collaborative mindset was the prerequisite for unlocking every other benefit.
3. The Myth of the Boring Box: True Modern Methods Unleash Design Freedom
A common fear among architects and clients is that modern methods of construction (MMC)—particularly a "kit of parts" approach—will lead to a monotonous landscape of repetitive, uninspired buildings. This is a fundamental misunderstanding of the concept.
Innovators such as architect Warren Liu emphasise that the goal isn’t rigid standardisation, but rather “customised modularity”.
This approach uses a kit of parts designed with enough flexibility to adapt to context, culture, and individual needs. A well-designed system establishes a set of rules that allows for infinite design expressions without compromising efficiency, giving architects the freedom to create diverse, context-specific buildings. As WSP's Sinclair notes, good designers don't fear constraints; they thrive on them.
"There is no reason why this does not create good architecture. It just becomes a constraint on the design process. And trust me, really good architects soak up constraints. It's just part of what you do if you're a good designer."
Credit to Ar. Warren Liu, CEO, Inplex
4. Stop Trying to "Fix" Construction with AI
There is enormous buzz around Artificial Intelligence in construction, but applying it to the industry's current processes is like trying to put a jet engine on a horse-drawn cart. The industry remains fundamentally reliant on a system of delivering thousands of drawings for a single project—a process that is inherently broken, inefficient, and prone to error.
Layering AI over this chaotic system only optimizes something that shouldn't exist in the first place. For AI to be truly transformative, the industry must first make a foundational shift from a reliance on drawings to a foundation of structured data. Only then can AI be powered up to its full potential.
As Dale Sinclair bluntly puts it:
"People seem to think that in a process where we deliver thousands of drawings, it's a good idea to layer in AI. It's crazy. We need to get rid of the drawings first before AI is really going to be powered up."
5. The Secret to Cost Savings Isn't Standardization, It's Aggregation
While standardizing components is a vital step, it is not the ultimate driver of cost reduction. The single most powerful lever for making modern methods cheaper than traditional construction is the aggregation of demand.
This principle was put to the test on the UK’s New Prison Program. By committing to a pipeline of four prisons using the same platform design, the government gave the supply chain the confidence to invest, innovate, and optimize. This aggregation created the economies of scale needed to drive down unit prices. The results, reported by Kier Construction, were tangible: the program saved over £250,000 in costs on HMP Millsite compared to the previous project and reduced embodied carbon in its pre-cast components by nearly 19%. Aggregation transforms industralised construction from a costly experiment into a proven, more affordable strategy.
6. Solving the "30 Million Variation" Problem in a Single Toilet
To grasp the crippling complexity of traditional construction, consider a single toilet. With countless combinations of fixtures, fittings, pipes, and finishes selected on a project-by-project basis, a typical installation can have around 30 million possible variations. This staggering level of complexity explains why contractors are overwhelmed with requests for information (RFIs) and why errors so frequently occur on site.
Credit to Dale Sinclair, Global Lead for MMC, WSP
Contrast this with Tesla, which offers only 30 variants for its cars. The solution lies in the manufacturing playbook: use pre-vetted catalogs and digital configurators. On the prison program, this was achieved by designing the core T60 house block from approximately 1,800 pre-cast concrete units. These weren't empty shells; each unit arrived on site with pre-glazed windows, door frames, conduits, and even shower gullies with perfectly sloped floors already cast in. This approach drastically simplifies decision-making and ensures that every component is designed to work together seamlessly from the start.
Credit to Andrew Dewdney, Head of MMC, Kier Construction
Conclusion: A New Blueprint for Building
The future of construction will not be defined by any single technology, but by a fundamental rewiring of its operating system. The shift is from projects to programs, competition to collaboration, drawings to data, and from bespoke complexity to configured simplicity.
These principles are not theoretical. As the UK’s New Prison Program demonstrates, they provide a proven blueprint for delivering better, faster, more sustainable, and more predictable outcomes. The evidence is clear, leaving us with a final, pressing question: If this blueprint can successfully deliver prisons, what is stopping us from applying it to our most critical housing, school, and healthcare challenges?
Be part of the ideas driving our industry forward at IBEW 2026.